Skip to main content

Search from vocabulary

Content language

Concept information

Preferred term

integration.time  

Description

  • Actual integration time
  • Actual integration time (could be smaller than DATETIME.STOP - DATETIME.START e.g. due to breaks; clouds ...)
  • Duration of the DOAS measurements corresponding to the retrieved profile
  • Duration of the MAXDOAS measurements corresponding to the retrieved profile
  • Duration of the measurement corresponding to the retrieved datapoint
  • Effective meas. time
  • Effective measurement time

URI

https://vocabulary.evdc.nilu.no/evdc_vocab/integration.time

Download this concept: